Calendar
West Bloomfield Household Hazardous Waste Drop-Off Event
- Spring event: Saturday, April 26, 2014
- Fall event: Saturday, September 20, 2014
Information:
- Information Hotline 248-451-4834. Taped message only.
- Postcards will also be mailed out by the Township. haz-waste-events-postcard-2013
- West Bloomfield Township website – Environmental Services department
Acceptable items include:
- Garage and garden chemicals, workshop materials, kitchen and bath cleaners, batteries, electronics, paint, and much more
- Non-perishable, unexpired food donations for the Lighthouse of Oakland County “Food for Hungry Kids” drive.
- Curbside drop-off of unwanted firearms, ammunition, and prescription medications in the front parking lot of the Police Department
- Personal documents for shredding – up to 50 pounds
Precinct 9 (see precinct 9 map)
General Election – Tuesday, November 4, 2014
Beth Ahm Synagogue
5075 Maple Road, West Bloomfield 48322
Across from Knollwood Country Club – Handicapped Entrance on east side of building
Includes:
- State House District – 40
- State Congressional District – 14
- County Commissioner District – 13
- School District – Farmington
See also:
- Other West Bloomfield precincts – listing and maps
- Project Vote Smart – search for Zip Code “48322-4031” – upcoming election candidates, profiles, ballot measures
- Vote411.org – Your Voting Guide – League of Women Voters
The Oakland County Water Resources Commissioner’s Office, in cooperation with the City of Farmington Hills, will begin construction on the Middlebelt Road Transport and Storage Tunnel Project in December.
The project involves building a 7,600-foot long, 9-foot diameter tunnel under Middlebelt Road from just north of I-696 to 13 Mile Road in Farmington Hills. The tunnel will temporarily store excess water during heavy rain storms to reduce the like likelihood of residential sanitary sewer overflows and basement flooding.
Representatives from the City of Farmington Hills, the Oakland County Water Resources Commissioner’s Office, the design engineers (Wade Trim and NTH) and the contractor (Ric-Man Construction) will be available to answer any questions you may have regarding this project.