Calendar
Kimberley North Improvement Association
Board Meeting
at the Toth residence, 5586 Abington, on Thursday, Aug 21st
Kimberley North Improvement Association
Board Meeting
on Tuesday, September 16th at 7:00 pm at the Toth residence
located at 5586 Abington, West Bloomfield, MI 48322
West Bloomfield Household Hazardous Waste Drop-Off Event
- Spring event: Saturday, April 26, 2014
- Fall event: Saturday, September 20, 2014
Information:
- Information Hotline 248-451-4834. Taped message only.
- Postcards will also be mailed out by the Township. haz-waste-events-postcard-2013
- West Bloomfield Township website – Environmental Services department
Acceptable items include:
- Garage and garden chemicals, workshop materials, kitchen and bath cleaners, batteries, electronics, paint, and much more
- Non-perishable, unexpired food donations for the Lighthouse of Oakland County “Food for Hungry Kids” drive.
- Curbside drop-off of unwanted firearms, ammunition, and prescription medications in the front parking lot of the Police Department
- Personal documents for shredding – up to 50 pounds
Precinct 9 (see precinct 9 map)
General Election – Tuesday, November 4, 2014
Beth Ahm Synagogue
5075 Maple Road, West Bloomfield 48322
Across from Knollwood Country Club – Handicapped Entrance on east side of building
Includes:
- State House District – 40
- State Congressional District – 14
- County Commissioner District – 13
- School District – Farmington
See also:
- Other West Bloomfield precincts – listing and maps
- Project Vote Smart – search for Zip Code “48322-4031” – upcoming election candidates, profiles, ballot measures
- Vote411.org – Your Voting Guide – League of Women Voters
The Oakland County Water Resources Commissioner’s Office, in cooperation with the City of Farmington Hills, will begin construction on the Middlebelt Road Transport and Storage Tunnel Project in December.
The project involves building a 7,600-foot long, 9-foot diameter tunnel under Middlebelt Road from just north of I-696 to 13 Mile Road in Farmington Hills. The tunnel will temporarily store excess water during heavy rain storms to reduce the like likelihood of residential sanitary sewer overflows and basement flooding.
Representatives from the City of Farmington Hills, the Oakland County Water Resources Commissioner’s Office, the design engineers (Wade Trim and NTH) and the contractor (Ric-Man Construction) will be available to answer any questions you may have regarding this project.
The Road Commission of Oakland County (RCOC), in cooperation with the Charter Township of West Bloomfield, will conduct a public input and information meeting on January 7, 2015, from 4 to 7 pm concerning the proposed reconstruction of Orchard Lake Road from 14 Mile Road to Maple Road as a four-lane boulevard.
Meeting details:
- Wednesday, January 7, 2015
- Warner Upper Elementary School (Media Center)
30303 West 14 Mile Road, Farmington Hills, MI 48334
The purpose of the meeting is to obtain public comment and input regarding the proposed revision of the design for the reconstruction of this section of Orchard Lake Road. The design is part of the federally mandated Environmental Assessment process for the project, which is intended to help ensure the community is involved in the selection of the best design alternative.
Proposed project details:
The original preferred alternative contained in the Environmental Assessment for this portion of the Northwestern Connector project called for Orchard Lake Road to be constructed as a six-lane boulevard with a roundabout at the Powers/Orchard Lake intersection. Due to input from the community and other area road network improvements, including the completion of the Martin Parkway extension, a re-evaluation of the preferred alternative is being completed as required by Environmental Assessment process.
Through the evaluation process, it was determined that the preferred alternative could be reduced to a four-lane boulevard with a standard traffic signal at the Powers/Orchard Lake intersection. With this revision, the project is expected to achieve the goals of reducing traffic congestion and improving traffic and pedestrian safety and mobility within the corridor.
The project is a continuation of the construction currently underway at the 14 Mile/Orchard Lake/Northwestern Highway “triangle,” which is also part of the Northwestern Connector project. The Northwestern Connector project is a series of improvements intended to enhance traffic flow and alleviate congestion related to the dead-ending of Northwestern Highway at Orchard Lake Road.
Project schedule and funding
The section of Orchard Lake Road is expected to be reconstructed in 2016. The project will be paid for with federal funds and dollars from the Road Commission and West Bloomfield Township.
For more information:
Call the RCOC Department of Customer Services at 877-858-4804 or send an email via the RCOC website at www.rcocweb.org.
KNIA Annual Meeting 2015
- Tuesday, February 10, 2015
at Warner Upper Elementary School on 14 Mile Road
- 6:30 pm check in and meet your neighbors
- 7:00 pm meeting to about 8:30
[su_box title=”Participate in discussions about these topics:” box_color=”#ed5554″]
- Election of Board Officers
- Presentation of Budget for 2015
- Presentation by Jeff O’Brien of the Road Commission of Oakland County – Updates on the recent and upcoming road construction projects in our area (the 14 Mile Road rerouting project, the Orchard Lake Road/14 Mile Road roundabout project, the Orchard Lake Road boulevard project, and more)[/su_box]
See you there. Please spread the word and bring a neighbor to this important meeting.